Within town limits Permit Office
Electrical permit or inspection for one or more of the following:
Residential:
• Any structure movement (house, mobile home, etc..)
• Temporary construction
• Permanent construction
• Existing structure (service line installation)
• Rewiring, Upgrade, Repair
• 12 month vacancy
• Tampering or inactive consumption (only if meter pan damaged)
Commercial:
• Any structure movement (shed, barn, etc..)
• Temporary construction
• Permanent construction
• Existing structure (service line installation)
• 12 month vacancy
• Rewiring, Upgrade, Repair
• Tampering or inactive consumption (only if meter pan damaged)
• Exception: No Permit required for Cox Communications
See
Also: