Within town limits Permit Office
State Requirement
Before clearance can be given on a highway or waterway for moving a house, etc., The State now requires a permit before the work can be done.
Special Instructions
Only licensed Electrician/Plumber may contact the permit office to receive a permit/approval.
As of June 1992, The State of Louisiana has passed a law which states that “no permit is required to connect or re-connect a traffic signal light located on state property” (i.e. highways, buildings, etc.)
Electrical permit or inspection for one or more of the following:
New construction, temporary meter
New construction, permanent meter
Existing structure-if Entergy has to run a service line a permit is required
Vacant longer than 12 months for residential, commercial
Fire reconnect
Electrical code violation
Rewiring/increase in service
Meter pan/base or loop change/relocation
All new occupants for mobile home establishments
Emergency reconnect
Work inside meter pan or repairs to mast or weatherhead